Industrial rollout
When the factory needs to run
A new industrial site in northern Czechia was about to go into production. The network fabric was causing problems, and remote troubleshooting had stopped helping. At 21:00, Silvan decided the next useful step was to be there. By the next afternoon, after two flights and a train, he was on site with the local team, and the rollout was moving again.
Turku → Helsinki → Paris → Prague → northern Czechia
Read the full story on pyro.institute


